Phase 1: Atlantic Gate.

Phase 1 Atlantic Point consists of performing ground works clearing the site ready for development of commercial units to be sold to Businesses and investors. Phase 1 building will be structurly capable of supporting a upper floor for office or extra storage space. All Phases are to be uniform in look and environmental performance.

Phase 1 foundation excavated, left to cure and is now ready for steel work to begin.

phase 1, atlantic point foundation complate
phase 1, atlantic point start erecting steel
phase 1, atlantic point foundation complate
phase 1, atlantic point, steel frame finished
phase 1, atlantic point foundation complete
  • Placed pipes and ducting for water, fresh, rain, waste, electic's, gas and telecoms/data.
  • Floor was insulated prior to meshing being placed and then it was ready for the concrete to be poured and levelled.
phase 1 drainage pipe
outer skin and roof now complete
pour concrete floor
laying concrete insulated floor
phase 1 insulated concrete floor still at it
floor complete
floor being flatened
finsihed floor
  • Windows, entrance doors and roller shutter doors are next to be fitted to make the building weather proof
installation of windows on site
windows and doors fitted
roller and entrance doors being fitted
  • Coating of internal steel work
  • Internal construction of partition walls
  • Upper office floor being constructed
  • Services being installed, gas, electric, water & waste
internal coating of steel work to add extra protection
construction of internal partition walls
partition block work complete and stairs are installed
upper office area joists installed and ready for boarding and partitions
upper office area construction
installation of main electrics
upper office area construction of partition wall and insulation being constructed
partition wall constructed and insulation being added
board up all insulation
  • Where customer specified extra finishing touches:-
  • Install wall trunking for Electrics and Data
  • Install upper Seperate male & female toilet and kitchen
  • Plaster and decorate to high standard
  • Install glass partition walls
  • Install air conditioning
  • Carpet through out
plastering finished and ready for services and decoration
upper office and kitched area install of water and electrics now complete
upper office area kitchen completed
plastering the toilet area now complete
toilet appliances are installed and decorated
ceiling fitted with air conditioning units installed
ceiling completed with air conditioning units fitted
ceiling tiles fitted to finished ceiling
office area plastered
office area decorated with trunking added, electrics and data installed
office area decorated with trunking installed to gice electrics and data, air conditioning installed, carpeted and glass partitions to finish it all off
entrance way building work completed, partition boarded ready for cableling
entrance way near completed, part decorated with finishing off of alarm systems needed
stairs carped and tiled, walls painted